Subdivision: The Landing at Arnold Park

Construction of homes is underway for the Landing at Arnold Park Subdivision, located off Wagstaff Road near the intersection of S Main Street (Hwy 401). This open space development features 12 single-family lots averaging 6,439 square feet and 79 townhome lots with 5.656 acres of open space on 15.37 acres.

Townhomes Project Status: Under Construction

  • Current Progress:

    • Preliminary Plan/Construction Drawing in Review
    • Preliminary Plan/Construction Drawing Approval
      • Town Board Approval: 10/1/2018
    • Construction of Infrastructure
    • ➙ Construction of Homes

Single-Family Project Status: Under Construction

  • Current Progress:

    • Preliminary Plans in Review
    • Preliminary Plan Approval
      • Town Board Approval: 10/1/2018
    • Construction Drawing Review
    • Construction Drawing Approval
      • Staff Approval: 10/29/2019
    • Construction of Infrastructure
    • ➙ Construction of Homes


Contact Information:

Developer

Mauldin-Watkins Surveying
1301 Broad St
Cary, NC 27518 

Engineering Firm

The Spaulding & Norris
972 Trinity Rd
Fuquay-Varina, NC 27526

Preliminary Plan Townhomes

Arnold Park Townhomes Site Planpng_Page1

Preliminary Plan Single-Family

Arnold Park Townhomes Subdivision Site Planpng_Page1

Rezoning:

  • Residential Medium Density-Conditional Zoning District (RMD-CZD)

    • Town Board Approval: 6/5/2017
  • Conditions: 

  • A minimum of 25% of the site adjacent to Carriage Heights and Southern Oaks Subdivisions shall only be used for single-family detached dwellings.