Construction of homes is underway for the Landing at Arnold Park Subdivision, located off Wagstaff Road near the intersection of S Main Street (Hwy 401). This open space development features 12 single-family lots averaging 6,439 square feet and 79 townhome lots with 5.656 acres of open space on 15.37 acres.
Townhomes Project Status: Under Construction
Current Progress:
Preliminary Plan/Construction Drawing in Review
Preliminary Plan/Construction Drawing Approval
Town Board Approval: 10/1/2018
Construction of Infrastructure
➙ Construction of Homes
Single-Family Project Status: Under Construction
Current Progress:
Preliminary Plans in Review
Preliminary Plan Approval
Town Board Approval: 10/1/2018
Construction Drawing Review
Construction Drawing Approval
Staff Approval: 10/29/2019
Construction of Infrastructure
➙ Construction of Homes
Contact Information:
Developer
Mauldin-Watkins Surveying 1301 Broad St Cary, NC 27518
Engineering Firm
The Spaulding & Norris 972 Trinity Rd Fuquay-Varina, NC 27526
Preliminary Plan Townhomes
Preliminary Plan Single-Family
Rezoning:
Residential Medium Density-Conditional Zoning District (RMD-CZD)
Town Board Approval: 6/5/2017
Conditions:
A minimum of 25% of the site adjacent to Carriage Heights and Southern Oaks Subdivisions shall only be used for single-family detached dwellings.