Mayor's Message
Town Board of Commissioners
Board of Adjustment
Planning Board
Water Conservation Notice
Citizen Information
2008 Holiday Schedule
Centennial Commission
Garbage and Recycle Notice
Applications and Forms Complete List
Frequently Asked Questions
Unwanted Periodicals
Event Calendar
Town Holiday Schedule
Department Directory
Administration
Engineering Department
Finance Department
Fire Department
Human Resources Department
Information Technology Department
Inspections Department
Parks, Recreation and Cultural Resources
Planning Department
Police Department
Public Utilities (Water and Sewer)
Public Works (Streets and Sanitation)
Employment Opportunities
GIS Mapping Service
Related Links
Contact Information
Home
Keyword Search
Site Map
Home | Contact | Print       A   A   A   A
Mayor's Message
Board of Commissioners
Board of Adjustment
Planning Board
Community Information
Calendar
Departments
Employment Opportunities
GIS Server
Related Links
Contact Us
Home Page
The Town of Fuquay-Varina, NC
Keyword Search

 
 Planning Department[ Department Directory ]  
Final Plat

Once the preliminary subdivision plan has been approved by the Town; construction plans have also been approved; and the installation of all improvements (utilities, streets, curb and gutter, sidewalks, landscaping and other related improvements) in accordance to the approved plans have been completed, the developer or owner may submit the final plat map for review and signature by the Town. The Wake County Register of Deeds will not record the plat map until the Town has signed the map. The following procedure and information is required by the Town to prepare the final plant map for recording:

Submit three (3) paper copies of the final plat map to the Planning Department for review. The final plat map must contain all information related to the phase or phases to be recorded with gross acres for each phase; identify each lot with metes and bounds and include acreage or square feet,building envelope setbacks and lot number; right-of-way dedication; utility and greenway easements as required; delineated wetlands, 100 year floodplain boundaries, riparian buffers and flood hazard soils; required plat certifications and any conditions or restrictions specific to the approved preliminary subdivision plan and construction plan. The final plat map must be tied to NC Grid Datum.

The Town will assign street addresses for each lot shown on the final plat map.

The Town will calculate fees, which are based on the cost for water and sewer for each residential unit of the phase(s) submitted on the final plat map. The Town will require the dedication of recreation land or a payment in lieu of dedication that is paid at thus time also. The fees must be paid in full to the Town (Planning Department) prior to the Town signing the final plat map.

Submit two (2) paper copies of the As Builts to the Planning Department for review. The As Builts must be field verified for all installed construction including sanitary sewer and water lines (with cross reference by distance to valves, manholes, water meters and cleanout locations), streets, catch basins, curb and gutter, sidewalks, fire hydrants, constructed elevations of top and inverts for sanitary sewer and storm drainage, easements, rights-of-way dedication and landscaping if part of the approved construction plans. The Town will not sign the final plat map until As Builts have been approved and one (1) set of mylar, (1) set of paper and (1) digital (.dwg or .dxf - format for CAD) As Builts has been submitted to the Town.

The Town will return one (1) redlined paper copy of the final plat map and one (1) paper copy of the As builts plan to the developer, owner or designated representative. The final plat map must be adjusted based on any comments from the Town and the same will be done for the As Builts.

Submit mylar(s) of the final plat map and one (1) set of mylar As Builds to the Planning Department. The mylar(s) must be signed by the surveyor and the property owner prior to the Town signing the final plat map.

The Public Works Department will be notified to conduct a field inspection for all improvements (streets and utilities) that are associated with the final plat map. Once the Public Works Department has completed their inspection, a punch list will be provided identifying any deficiencies that need to be corrected. In most cases, the deficiencies can be corrected during the one (1) year warranty for the streets and utilities, however at times there may be specific deficiencies that must be corrected prior to the Town signing the final plat map. The punch list and specific corrections that need immediate attention will be submitted to the developer or owner to address. If there are deficiencies that need immediate attention, the Town will not sign the final plat map until the corrections are made and approved by the Public Works Department.

The Town is under contract with Wake County to provide services for erosion and sedimentation control. The developer is responsible to contact Wake County Environmental Services to communicate to them that a final plat map has been submitted to the Town for recording. If the County has issues that need to be addressed this must be done prior to the Town signing the final plat map. Additionally, the Town must receive a Certificate of Compliance from Wake County in order for the Town to sign the map.

Submit copies of the State Certification for water and sanitary sewer to the Engineering Department, which must be signed and sealed by the engineer who designed the utility system.

If the streets are to be maintained by the NC Department of Transportation the proper certification on the map must be signed by NCDOT before the Town will sign the final plat map.

With all procedures and information completed above, the Town will sign the final plat map and notify the developer, owner or their designee to pick up the mylar(s) for recording at the Wake County Register of Deeds.

Submit seven (7) paper copies of the recorded plat map to the Planning Department. The Town will not issue any building permits until the recorded plat map is received by the Town.

Bonds and Irrevocable Letters of Credit

If all the improvements have not been installed the developer or owner may submit a request to the Town to accept a bond or irrevocable letter of credit for the unfinished improvements. The Town will not accept a bond or irrevocable letter of credit for utilities, however the Town will consider streets, curb and gutter, sidewalks and landscaping. The engineer of record for the project must submit a cost estimate of all unfinished improvements with unit cost and quantities to the Planning Department. The Planning Department will forward the estimate to the Town Engineer for review. Once the Town Engineer has approved the cost estimate the developer or owner will be notified to submit a bond or irrevocable letter of credit in the amount of the cost estimate plus ten percent (10%). The bond or irrevocable letter of credit must be submitted to the Planning Department before the Town will sign the final plat map. Also, the one (1) year warranty for the improvements will not begin until the bond or irrevocable letter of credit is released by the Town.

One year warranty

The one (1) year warranty is required by the Town to ensure that the improvements meet material and workmanship standards. Any deficiencies that occurred during the one (1) year warranty are the responsibility of the developer or owner to repair. A final inspection is required. It is the developer/owners' responsibility to notify the Town Public Works Department prior to the end of the warrenty (60 days is requested) to setup the end of warranty inspection. The developer or owner will be notified of all deficiencies that must be corrected prior to the Town taking over the maintenance of the improvements. The Town will provide the developer or owner with a written notification that the Town has accepted maintenance of the improvements.

 Navigation
 About Our Department
 Frequently Asked Questions
 Contact Us
 Meet Our Staff
 Calendar
 Schedules
 Applications
 Transportation Plan
 Land Use Plan
 Subdivision Approval Process
 Minor/Exempt/Recombination Subdivisions
 What's Coming to Fuquay-Varina
 Demographics
+ Rezoning
+ Maps

 Downloads
 Ordinances
»Article J Development Standards (setbacks)
»Proposed Conditional Zoning Districts Amendment
»Flood Damage Prevention Ordinance (Adopted 8/7/06)
»NFIP Reinstates the Town of Fuquay-Varina, NC
 Brochures
»BOA - Brochure
»Rezoning - Brochure
 Site Plans and Subdivisions
»Varina Park OSD Subdivision
 General Downloads
»Demographic Tables, population projections
»Census Information for Fuquay-Varina, Year 2000
»Plat Certificates
 Applications
»Annexation Petition With Out Sewer
»Annexation Petition With Existing Utilities
»Petition for Varince
»Recreation Land Dedication or Fee-In-Lieu Payment
»Zoning Ordinance Text Amendment
 Rezonings
»REZ-2008-017_Sandhar Map
»REZ-2008-017_Sandhar Report
»REZ-2008-15_RL_Vaughan Map
»REZ-2008-15_RL_Vaughan Report
»Map on Rezoning Proposal REZ-2008-16_1108 Holland Rd.
»Report on Rezoning Proposal REZ-2008-16_1108 Holland Rd.
»Map on Rezoning Proposal REZ-12_910 N Main St.
»Report on Rezoning Proposal REZ-12_910 N Main St.
»Map on Rezoning Proposal REZ-2008 -11 Cherry St.
»Report on Rezoning Proposal REZ-2008 -11 Cherry St.
»Map on Rezoning Proposal REZ-2008 -10 Carr Pur Dr.
»Report on Rezoning Proposal REZ-2008 -10 Carr Pur Dr.
»Map on Rezoning Proposal REZ-2008 Brighton Bluff
»Report on Rezoning Proposal REZ-2008 Brighton Bluff
»REZ-2008-05 Mapp Judd Parkway Village 1B
»REZ-2008-05 Judd Parkway Village 1B
»REZ-2008-05 Map Judd Parkway Village 2B
»REZ-2008-05 Judd Parkway Village 2B
»REZ-2008-02 Bass Lake Rd. Staff Report
»REZ-2008-02 Bass Lake Rd.
»REZ-2008-003 Turlington Property Staff Report
»REZ-2008-003 Turlington Property
»REZ-16-07 NC HWY 42
»Map for REZ-17-07 New Hope Pres Ch.
»REZ-17-07 New Hope Pres Ch.
»REZ-15-07 Fidelity Bank
»REZ-14-07 Thomas & Britt
»REZ-13-07_Brighton Forest phase 4
»REZ-12-07_Balletine Dairy
»REZ-11-07_Holland Rd
»Report on Zoning Proposal REZ-13-07_Brighton Forest phase 4
»Report on Rezoning Proposal REZ-12-07_Balletine Dairy
»Report on Rezoning Proposal REZ-11-07_Holland Rd
»Rezoning Proposal REZ-10-07_Lake Wheeler Rd
»REZ-09-07_Holland Rd
»REZ-08-07_Herbert Akins Rd
»REZ-07-07 Schnapps Ln
 Maps
»Land Use Plan Map
»Growth Management Area Map
»08 Official Zoning Map
»Throughfare Plan Map
»Subdivisions Map
»08 Base map of jurisdiction
»April 07 Community Transportation Plan
»Urban Services Area - Short Range & Long Range
 Transportation Plan
»Table of Contents
»Chapter 0 - Executive Summary
»Chapter 1 - History and Background
»Chapter 2 - Community Vision
»Chapter 3 - Thoroughfare Element
»Chapter 4 - Collector Street Element
»Chapter 5 - Transit and Rail Element
»Chapter 6 - Pedestrian and Bicycle Element
»Chapter 7 - Implementation Plan
 Board of Adjustment
»BA-08-07_Johnson Pond Learning Center map

 Frequently Asked Questions
»What is new in Town?
»How do I connect to Town water or sewer?

 Related Links
 Planning Links
»Wake County Government
»Federal Emergency Management Agency