Mayor's Message
Town Board of Commissioners
Board of Adjustment
Planning Board
Water Conservation Notice
Citizen Information
2008 Holiday Schedule
Centennial Commission
Garbage and Recycle Notice
Applications and Forms Complete List
Frequently Asked Questions
Unwanted Periodicals
Event Calendar
Town Holiday Schedule
Department Directory
Administration
Engineering Department
Finance Department
Fire Department
Human Resources Department
Information Technology Department
Inspections Department
Parks, Recreation and Cultural Resources
Planning Department
Police Department
Public Utilities (Water and Sewer)
Public Works (Streets and Sanitation)
Employment Opportunities
GIS Mapping Service
Related Links
Contact Information
Home
Keyword Search
Site Map
Home | Contact | Print       A   A   A   A
Mayor's Message
Board of Commissioners
Board of Adjustment
Planning Board
Community Information
Calendar
Departments
Employment Opportunities
GIS Server
Related Links
Contact Us
Home Page
The Town of Fuquay-Varina, NC
Keyword Search

 
 Inspections Department[ Department Directory ]  
Commercial Plan Review Fire Protection Checklist

FUQUAY-VARINA INSPECTIONS

FIRE PROTECTION PLANS

Note: The information is required for each respective discipline; however, in most cases it need not be within the discipline drawings nor repeated within the discipline drawings if the information exists within the drawing set.

_____ A. Complete a sprinkler design data sheet and include it on the first plan of the sprinkler drawings.

_____ B. Show floor plans for each floor with sprinkler piping layout, pipe sizes, pipe hanger details, piping materials, hose stations, fire extinguishers, doors, walls, and room identities.

_____ C. Show ceiling plans with sprinkler head(s) layout, walls, soffits, openings, doors, dimensions, and room identities.

_____ D. Verify system design by providing hydraulic calculations along with the following:

_____ Recent water flow test.

_____ 10 percent safety margin.

_____ Type of backflow preventer.

_____ Fire pump summary.

_____ E. Note the type of Sprinkler System used [13, 13R, ESFR, 231, or OTHER__________]

_____ F. For Residential Occupancy (i.e. Apartments, Condos) show sprinkler head location at breezeway if applicable.

_____ G. Indicate the UL/FM# hourly rating of all rated members and assemblies i.e. columns, beams, floor and ceiling, and ceiling and roof fire-rated design assemblies. Show all fire-rated walls (both existing and new) with their ratings if not shown elsewhere. Drawings not showing fire-rated walls shown will be rejected.

_____ H. All penetrations of fire-rated construction to be per manufacturer detail. The details shall meet or exceed rating of construction being penetrated and shall be provided to the inspector in the field. The penetration details must be exactly as tested by an approved testing laboratory or agency and must include their system numbers.

_____ I. Provide a Fire Alarm riser showing connection to a UL approved central station. Show tamper switches on all 0S&Y valves and Post Indicator Valves (PIV). The plans must state that the fire alarm system is to be an addressable system.

_____ J. Commodity class and height of any storage.

_____ K. MSDS Sheets on any Hazardous Materials, to be located in Knox box where applicable.

_____ L. Where special Temperature rated or high temperature sprinklers are required, show sprinkler type(s) per area, office size, cut sheets with K-factor, water requirements, spray pattern, coverage, and other pertinent data.

SYSTEM CALCULATIONS

Note: The information is required for each respective discipline; however, in most cases it need not be within the discipline drawings nor repeated within the discipline drawings if the information exists within the drawing set.

Hydraulically calculated and pipe schedule fire systems should be designed with a 10 percent safety margin for all new buildings and additions to existing buildings. Calculations for hydraulic systems should include:

_____ A. Flow and pressure at each flowing sprinkler head and hose stations.

_____ B. Flow diagram for a grid system.

Plan Review Full Permit Fire Prevention

Page 2

UTILITIES SITE PLAN (FIRE PROTECTION)

Note: The information is required for each respective discipline; however, in most cases it need not be within the discipline drawings nor repeated within the discipline drawings if the information exists within the drawing set.

_____ A. A site plan must be provided with fire department connection and all hydrants shown.

_____ B. Show the size of city main.

_____ C. Identify test hydrants and give flow and pressure data for each.

_____ D. Show the circulating or dead-end main and the distance to circulating main if it is a dead-end.

_____ E. Indicate the Valve type and size. Valve types include:

_____ Control Valves

_____ Fire Department connection check valve

_____ F. Show size, type, and depth of underground piping (from city main to inside of building). Provide:

_____ Underground piping connection detail.

_____ Detail of stub-out for hydrant.

_____ Blocking.

_____ Rodding and rod size.

_____ Clearance (12inches or 18 inches minimum from wall)

_____ G. Show backflow prevention devices on fire lines and if installed above ground how heated to 40 deg. F.

_____ H. Indicate the distance and location of all fire hydrants. Allowed distances are:

_____ 100 feet maximum from Fire Department connection.

_____ 300 feet maximum between hydrants on commercial and industrial.

_____ 500 feet maximum between hydrants on residential.

_____ I. Minimum size of fire lines:

_____ Dead-end lines: 12 inches minimum

_____ Looped lines: 8 inches minimum

_____ J. All hydrants will be Mueller with 4 inch steamer connection and two (2) 2 inch hose connections.

_____ K. Bollard locations to be denoted on plans for protection of hydrants.

_____ L. Indicate any other water supply (i.e. wells, tanks, etc.) where applicable.

 Navigation
+ About The Inspections Department
 Frequently Asked Questions
+ Calendar
› Commercial Plan Review Checklist General
› Commercial Plan Review Architectural Checklist
› Commercial Plan Review Structural Checklist
› Commercial Plan Review Fire Protection Checklist
› Commercial Plan Review Mechanical Checklist
› Commercial Plan Review Plumbing Checklist
› Commercial Plan Review Electrical Checklist
+ Residential Permit Submittal Information
+ Inspection Department Fee Schedule
 Licensed Contractors State Laws & Regulations

 Downloads
 Construction in Progress
»Construction in Progress
 Applications
»Building Permit
»Sub Contractor List
»Trade Permit
»Sign Permit
 Pictures
»Work during Construction
 PDFs
»Ordinance Amendment ZA-05-07

 Frequently Asked Questions
»What building code is enforced in the Town of Fuquay-Varina?
»Are there any special codes in effect in the Town?
»Is a permit required for construction of a deck on my own property?
»When is a contractor licensed required?
»What size building can be constructed without a permit?
»How do I schedule inspections?
»How many sets of plans are required for single family residential plan approval?

 Related Links
 Other Codes
»North Carolina Rehab Code
 Building Code Agencies
»Home Builders Association
»North Carolina Offfice of the State Fire Marshal
 State Licensing Agencies
»NC Licensing Board for Plumbing & Mechanical Contractors
»N C Licensing Board for Electrical Contractors
»North Carolina Licensing Board for General Contractors