Mayor's Message
Town Board of Commissioners
Board of Adjustment
Planning Board
Water Conservation Notice
Citizen Information
2008 Holiday Schedule
Centennial Commission
Garbage and Recycle Notice
Applications and Forms Complete List
Frequently Asked Questions
Unwanted Periodicals
Event Calendar
Town Holiday Schedule
Department Directory
Administration
Engineering Department
Finance Department
Fire Department
Human Resources Department
Information Technology Department
Inspections Department
Parks, Recreation and Cultural Resources
Planning Department
Police Department
Public Utilities (Water and Sewer)
Public Works (Streets and Sanitation)
Employment Opportunities
GIS Mapping Service
Related Links
Contact Information
Home
Keyword Search
Site Map
Home | Contact | Print       A   A   A   A
Mayor's Message
Board of Commissioners
Board of Adjustment
Planning Board
Community Information
Calendar
Departments
Employment Opportunities
GIS Server
Related Links
Contact Us
Home Page
The Town of Fuquay-Varina, NC
Keyword Search

 
 Inspections Department[ Department Directory ]  
Commercial Plan Review Architectural Checklist

FUQUAY-VARINA INSPECTIONS

ARCHITECTURAL DOCUMENTS
(DRAWINGS AND SPECIFICATIONS)

Note: The information is required for each respective discipline; however, in most cases it need not be within the discipline drawings nor repeated within the discipline drawings if the information exists within the drawing set.

_____ I. Show architectural floor plans of each floor showing the location and ratings of all fire-rated walls proposed for the project. Identify each type of rated and reproduce all applicable UL/FM details for the wall.
_____ J. Show the square footage of each floor on the corresponding floor plans.
_____ K. Identify the names and uses of each room.
_____ L. Indicate door schedule(s) that defines the applicable rated doors, frames, and hardware.
_____ M. Indicate all glass schedules.
_____ N. Show elevations with dimensions defining overall building height, floor-to-floor heights, or heights to ridge and eave as applicable to the type of building construction proposed.
_____ O. Provide basement percentage (%) below grade calculations.
_____ P. Indicate roof slopes and drainage system, sized through wall scuppers, if applicable to the project.
_____ Q. Show fixed seating for assembly occupancy to allow determination of occupancy posting.
_____ R. Show wall sections with proposed material sizes, construction, and fire-rated assemblies.
_____ S. Show connections, reinforcing steel, welds, and loading criteria.
_____ T. Show proposed plumbing fixtures and privacy screens on plans.
_____ U. If masonry construction proposed, include the following information:
_____ Type of brick ties and spacing of weep holes.
_____ Control joints.
_____ Placement of wall flashing, reinforcement per ACI 530.
_____ V. If appropriate for the proposed occupancy, show the extent of the hazardous locations and submit complete data on types and amounts of materials stored, processed, manufactured or used in the manufacturing of products in this facility and if such materials are corrosive, poisonous, under pressure, in a liquid or gaseous state, radioactive, or other relevant properties. (Ref. NCSBC Sec. 408 and NFPA 30). Provide Material Safety Data Sheets (MSDS).
_____ W. Show the floor slab vapor barrier.
_____ X. Show Foundation water proofing if applicable.
_____ Y. For pre-engineered metal buildings, submit the manufacturers letter of engineering certification, a sealed foundation plan, complete architectural plans, and the Metal Building Plans. The Metal Building Plans shall state model number, size, column reactions, and design loads for the building. State that the structural integrity of the building will be maintained and that the building meets the North Carolina State Building Code for live and dead loads in Wake County. The foundation plans when required by General Statute must be designed by a registered architect or engineer and show the size and reinforcement of footings or turn-down slab. Specify reinforcing, bolt pattern, and size for the building. Verify that the approved plans are on the job site until project completion.
_____ Z. Indicate the UL/FM # hourly rating of all rated members and assemblies (i.e. columns, beams, floor and ceiling, and ceiling and roof fire-rated design assemblies). Show all fire-rated walls (both existing and new) with their ratings if not shown elsewhere. Drawings submitted without fire-rated walls shown will be rejected. All penetrations of fire-rated construction to be per manufacturers details. The details shall meet or exceed rating of construction being penetrated and shall be provided to the inspector in the field. The penetration details must be exactly as tested by an approved testing laboratory or agency and they must include their system numbers.

Town of Fuquay-Varina
Plan Review
Page 2

_____ AA. All fabric awnings or canopies must be accompanied by a letter of certification of fire resistance from the manufacturer. Fabric awnings and canopies must meet ground snow loads and be constructed to support all live and dead loads according to Chapter16 of Volume 1, North Carolina State Building Code.
_____ BB. Show Penthouse drawings.
_____ CC. Provide on the drawings the calculations for the means of egress widths for the entire floor occupancy load and the existing capacity of all exits including all stairs, doors, corridors, and ramped exits. (Volume 1, Chapter 10 of the NC State Building Code).
_____ DD. Show attic ventilation louvers and vent sizes.

 Navigation
+ About The Inspections Department
 Frequently Asked Questions
+ Calendar
› Commercial Plan Review Checklist General
› Commercial Plan Review Architectural Checklist
› Commercial Plan Review Structural Checklist
› Commercial Plan Review Fire Protection Checklist
› Commercial Plan Review Mechanical Checklist
› Commercial Plan Review Plumbing Checklist
› Commercial Plan Review Electrical Checklist
+ Residential Permit Submittal Information
+ Inspection Department Fee Schedule
 Licensed Contractors State Laws & Regulations

 Downloads
 Construction in Progress
»Construction in Progress
 Applications
»Building Permit
»Sub Contractor List
»Trade Permit
»Sign Permit
 Pictures
»Work during Construction
 PDFs
»Ordinance Amendment ZA-05-07

 Frequently Asked Questions
»What building code is enforced in the Town of Fuquay-Varina?
»Are there any special codes in effect in the Town?
»Is a permit required for construction of a deck on my own property?
»When is a contractor licensed required?
»What size building can be constructed without a permit?
»How do I schedule inspections?
»How many sets of plans are required for single family residential plan approval?

 Related Links
 Other Codes
»North Carolina Rehab Code
 Building Code Agencies
»Home Builders Association
»North Carolina Offfice of the State Fire Marshal
 State Licensing Agencies
»NC Licensing Board for Plumbing & Mechanical Contractors
»N C Licensing Board for Electrical Contractors
»North Carolina Licensing Board for General Contractors